Arrow Industrial was awarded the industrial door package for this prestigious scheme, following in-depth technical design and specification meetings with the client, and a competitive tender process.
The Arrow team provided early advice on steelwork arrangements for the sectional doors which were to be used as loading bays. This enabled the fabricator to site the high-level steelwork in optimal positions which allowed Arrow to provide a perfect fit for each door.
Steel Doors were installed across the complex to ensure safe and secure ingress and egress for personnel, particularly in the event of an emergency.
Following a successful installation on the first nine units, Arrow was awarded the second phase works for a further seven units on this site due to our outstanding performance on the original scheme.